The volunteers have been working hard to clear the site and make it possible to open to the public in some form over the summer holidays. These are the jobs still to be completed:
Drag the last of the hedge prunings to the big bonfire
Drag the bramble prunings to the smaller bonfires
Light the two smaller bonfires
Stack as much of the scrap metal as easily accessible by the gate ready for collection (in hand)
Stack stuff we may want to keep on hard standing (may dispose of later)
Arrange collection of gas cylinders (may have to be moved off site first)(in hand)
Get plastic sheeting etc removed
Remove last of the fencing
Get the damaged willow tree seen to
Get mini tractor removed (in hand)
Clear around the pig sty and repeat all of the above
Arrange for the grass to be regularly cut (possibly got someone lined up)
Comments